An ambitious expansion project of a Liquid Natural Gas (LNG) terminal in China aims to double the capacity for importing and regasifying LNG.
During the course of industrial development, the idea and implementation of practical safety solutions emerged slowly but steadily. These solutions, particularly the use of standard relays such as the heavy-duty relay known as a contactor, became widespread and promoted.
Wellhead Control Panels (WHCP) are necessary for the safety of the storage and production wells in oil and gas fields.
The WHCP is an integrated system that, within a single cabinet, collects the electrical, pneumatic, and hydraulic circuits necessary for controlling all valves placed on the wellheads (SCSSV, master, wing), as well as safety valves (choke, ESD, HIPPS).